The list of jobs I have started but can't quite finish seems to be getting longer by the day.
My main goal was to populate the tunnel and the rear engine compartment, but this has lead onto other jobs.
I've finished populating the tunnel and have refurbished both the handbrake and gearchange assemblies.
Getting everything into the tunnel and into the right places took quite a few iterations and plenty of frustration but got there in the end.

As for the engine compartment, the engine seal is in, the oil tank is in, wiring loom in place, the fuel filter and accumulator and most of the lines are terminated. It seemed to take forever to get all the right fittings and rubber seals.

I have yet to populate the rear brakes and fix the handbrake cables, connect the fuel pump to the tunnel feed and fit the rear relay board. Other than that the engine compartment is pretty much done ( apart from the engine

I have also been fabricating my own brake lines from scratch which is taking longer than I had planned. I've managed to make the majority of them just the rear caliper ones to go if I can get a small enough bend radius. I've yet to fit my master cylinder so the front ones may need a small tweak at that point. The master cylinder brake switch I ordered is the wrong one, so another job I can't finish at the moment.
I've also fitted the front calipers but again the Pagid fitting kit I ordered doesn't seem to have quite the right clips, so another job to put on hold whilst I reorder.

Once I get the right parts for the front brakes and master cylinder I'll finish these jobs and then move back to the rear brakes, and then the rear relay board.
So in summary quite a lot of work done but few milestones met , but there is progress !