The issue of fit was really quite a simple one
They didn’t….or at least did….but not exactly….
We had 2 reference points for each of the 2 floor panels….
integral to the floors are longitudinal stiffeners, which at the front have a 9/16” hole precisely placed so it accepts a 9/16” bolt that locates the floor pressing into a bracket that is integral within the main engine frames.....and to the front torsion bar brackets....
And being an interference fit, this is a fix…..and the engine/bonnet frames only bolt onto the bulkhead in 1 position, so it is an absolute fix
At the rear Barry had made a jig to locate the rear trailing arm mounting points that are a special pressing which is welded onto the floor panels. His jig had been made to align the new mounts as per the original mount setting out
I had elected to have these trailing arm brackets pre-welded to the floor (on a jig) by the supplier
So they should have been perfect……but we could not get all 4 reference points to align
In hindsight not a major issue, but it diverted Barry from making progress for a while, until we agreed to simply undo the welds and re-align the trailing arm mounts later …..it was a matter of 4/5mm….but another example of accumulated tolerances and fabrication error
With floor positions established and the two floor panels temporarily screwed into position, the next step was to remove the near-side cill and start repair work on the lower areas of both the A posts and the B posts
The A post is a classic example of the Jaguar mentality and approach to production. Never imagining they would have the success they did, there was no appetite for complicated pressings…. and instead used a large number of simple folded pieces
An early 911 A post is largely made up of 2 pressings…….and E Type has 9 elements.......
Not necessarily a problem, but when it comes to unpicking these pieces it is a laborious process, not aided by the fact that there is little if any protective primer in sight……….so there is plenty of rust which in turn means more un-picking…..
The passenger side was also the side with the impact damage, so apart from rust repairs there was the small matter of straightening out the creases….and then onto repairing the upper A post/rear scuttle extension, truly a Heath Robinson affair…..but at least reassembled with zinc rich weld through primer this time around
The B post is equally simple in design….but again with no protection it is rusting from day 1 and after 55 years is not a pretty sight……
All in a (series of) days work for the master craftsman…….and a joy to behold as his signature flowing repair pieces are created and seamlessly blended into the shell
With both posts repaired the inner cill could be offered up for test fitting………..all good news in fact, these panels from Martin Robey are well made and accurate
Whilst not strictly necessary we also agreed to introduce an additional middle cill bracing structure, to reinforce the original jacking point, and also link the inner cross member end more fully into the overall cill structure…beautifully made and complimenting the style of the original braces
Before the inner cills could be fully welded barry trial fitted the outer cills………which as anticipated were not so straightforward……
To date no one makes cills perfectly (although latterly Chuck Hadley at Monocoque claims he can now produce 100% faithful copies…..)….the principle problem is a lack of curvature across their width…..and with the old cills and cill closer panels to use as reference points it was obvious there ones from Hutson’s were less than perfect
So heat treatment and a degree of shrinkage to induce more curvature……
They also don’t have correct forming for the top folded edge that interfaces with the inner cill and creates the necessary slot for the rubber trim, this is crucial to get a perfect tight joint line with the bottom of the door skin……..so it had to be “adjusted”
…and finally that have the wrong drain details for early cills….so they had to be “lost”, and a deeper fuller drain apertures formed (as made the cill drains are not deep enough and would not adequately drain the cill cavity, which was disappointing to see………….so Barry copied an original one, and by making a new tool was able to punch 4 new drains per side….perhaps more than required, but they look “factory” and are largely hidden, so piece of mind and a proper solution
With the nearside inner cill now verified to be in the correct position it was duly fully welded in place such that work could move to the driver’s side
Same as before…..mirror and repeat….
And what a fabulous sight to see this…Barry’s updates are the highlight of the week these days….a shell with most of the old rust removed, all panel edges formed and primed ready to receive the floor panels…………
But of course simply dropping the floors in as supplied was not good enough….oh no….we need signature modifications to create the original factory look……