Page 10 of 10

Re: 1971 Burgundy 911T

Posted: Sun Sep 14, 2025 8:27 am
by 911hillclimber
Andy, have you tried the new brakes yet, or is your foot still out of commission?

Re: 1971 Burgundy 911T

Posted: Sun Sep 14, 2025 9:22 am
by Lightweight_911
.

- as mentioned in the first of my last 2 posts above Graham.

I've not done any emergency stops yet but in 'normal' motoring the brakes seem fine with no squealing ...

.

Re: 1971 Burgundy 911T

Posted: Sun Sep 14, 2025 2:05 pm
by 911hillclimber
Ah, missed that.
Thanks.

Re: 1971 Burgundy 911T

Posted: Sun Sep 21, 2025 9:05 pm
by Lightweight_911
..

Just realised that I didn't post any pictures of the pump & new hoses after re-fitting the pump.

These were the old/hard hoses removed from their connections at the rear of the tunnel - possibly the originals !


Image

Image


Since the Pierburg pump just has an inlet & outlet - hence no facility for a return line - I used a short section of the 7.3mm Cohline hose blocked off at one end attached to the rigid pipe at the rear of the tunnel.

Access for fitting the other (9mm) new hose (feeding the pump) was very restricted so I had to resort to using some long reach hose pliers to be able to get the hose onto the rigid pipe at the rear of the tunnel.


Image


-& this is the refitted pump with the new hoses - looks much neater utilising the original pump wiring harness & rubber boot :


Image


- needless to say, whilst carrying out this job, I noticed a few other things under there that needed attention ...

.

Re: 1971 Burgundy 911T

Posted: Sat Sep 27, 2025 7:42 pm
by Lightweight_911
.

So, as mentioned, whilst I was under the car replacing the fuel hoses at the rear, I noticed a few other things that needed rectifying.

The first of these was the throttle linkage:

- the bell crank was removed from the side of the gearbox along with the throttle rod up to the engine compartment then cleaned & regreased :


Image

Image

Image

Image


The parts were then refitted together with a new rubber bellows at the tunnel exit (previously missing) :


Image


The long throttle rod seemed a bit 'sloppy' where it exited the tunnel & on further investigation it was discovered that the 3 plastic bushes which are meant to support it were missing, so replacements were duly ordered


Image


- I couldn't believe how expensive these are ... almost £10 ea for little bits of plastic !! :shock:


Next task was to replace/repair the old inner & outer rubber boots protecting the gearshift coupler.

The existing position of the coupler in relation to the shift rod was marked using some red paint, then the coupler removed/checked/cleaned & the inner boot which was split & in 2 pieces was super-glued back together :


Image


Whilst these were out of the way, the old/disintegrating outer boot was removed & a new replacement fed through from inside the tunnel


Image


The coupler was then refitted in its original position - you can just see the new (rearmost) plastic bush (supporting the throttle rod) fitted at the top right


Image

Re: 1971 Burgundy 911T

Posted: Sat Oct 04, 2025 11:06 pm
by hashman
Nice work as usual Andy.

Karl

Re: 1971 Burgundy 911T

Posted: Thu Oct 16, 2025 5:23 pm
by Lightweight_911
.

Fitting the other 2 plastic bushes in the tunnel supporting the throttle rod necessitated removal of the hand brake lever & gear change 'tower'.

Needless to say, this led to the inevitable "whilst I'm in there" scenario ...

So, with the handbrake lever assembly freed from the tunnel, the hand throttle's malfunctioning was investigated ... it transpired that there was nothing connected to the bottom of the hand throttle lever nor any signs of the plastic part on the floor of the tunnel !

Cheapest price for the plastic 'valve lever' was from the USA via Amazon (still cheaper than from any of the usual UK sources) so the part was ordered.


Image

Image


Fitting the part was fairly straightforward - just a bit 'fiddly' to get the tiny C-clip back on the end of the shaft (I hadn't disconnected the handbrake cables).


Along the same lines, whilst the gear lever was out in order to fit the throttle rod plastic bush, the opportunity was taken to replace the one at the base of the lever into which the 'ball' fits - as is often the case, the old one was cracked & worn:


Image

Image


The area in the tunnel beneath the gear lever was cleaned:


Image

Image


- then the new ball socket bush fitted to the gearlever & the associated parts refitted


Image



So that completed the additional string of minor jobs, each of which had unexpectedly cropped up as an aside to my original task of tidying up the fuel pump installation !


.