Thanks Arminius, I'm no metal worker or coach builder but I can appreciate the work that has gone into building it. Nice if others with more skill and an eye for this can appreciate the work M&Y are doing.
Speaking of which, progress continues at pace. Little details now to finish off the build all of which take time...
First up is the towing eye for the front of the car. this will be mounted to the subframe for the oil cooler. It needs to be bolted on as it needs to be removed prior to the front body work being removed....
Next up is an action shot of the already-completed Gurney roof bubble... Glad it's not me putting that curve in steel. It took three hours with that machine...
The next shot is one of my personal favourites for the whole build of the car. It's the lightening holes put into the tops of the sills. Not really required, but it all helps with weight saving, adds a bit of much needed access to the sill if we run pipes or wires along them, and looks just f*^king cool I think...
Another lovely shot here... this is the inside of the door. We decided a long time ago to put cut-outs in the door, again partly for weight saving, but also to give a bit more elbow room when you just need the space to 'crank the wheel'. Rather than put a simple rectangle in the door skin though we decided to follow the spaceframe...
Next up is the finished fuel filler cap. God this was a pain in the arse. The FIA requires all cars with a screw or Monza style filler cap to now have a modern threaded cap inside which is just horrible. Safer for sure, but horrible nonetheless. But this only applies if the cap sits proud of the. bodywork (it's in case the cap is ripped off in a crash...) so M&Y located it just under the bodywork line...
Here's the final make-up of the front bonnet and oil cooler ducting. So simple in it's final form but boy did this take some head scratching to make work. I'm pretty pleased with the final design, which ducts air over the oil cooler, through the bodywork, and vents it over the wipers, avoiding the need to dump it under the car and thereby creating lift...
The final few shots are of the doors, which are under final construction. Here's the VW bus rear latch push buttons in place, which we're using as door latches...
No door handles on this car, too much drag! Instead just small indents to get your fingers behind the door edge...
The latch needs to be floating to allow for adjustment of the door. An often overlooked detail on a special but crucial if you want gaps to be good all around....
Penultimate shot today is of the door latch, again made from scratch...
The final shot of the doors and indeed this session is the locating indent in the door for the Karmann Ghia/Porsche 356 door locator, that makes sure the door lines up square and shuts positively against the latch. All details but ones that mean the car will be a pleasure to use...
We're now into the final furlong, working out the myriad of small details, prior to me picking up the car and Ian installing the original engine that will be used for shakedown testing.... More in a month's time.